The body is the pressurized element of the steam generator, which can withstand the pressure. For details, please refer to the factory nameplate. Electric heating is located at the top of the steam generator.
1.Unique water circulation design to make boiler come to designed working pressure and pressure quickly and efficiently, there is pressure & temperature fluctuation even for feeding water process
2.Unique built-in steam separator to guarantee steam water content lower than 2%.
3.Electrical heated tube is connected with boiler body and flange, which is convenient to replace, repair and maintain.
4.Electrical heating tube can be subdivided controlled according to electrical heating group amount,for example 108KW electrical heating boiler is made of 6 piece of 18KW heating tube, so it can be subdivided into 3, each subdivision is 36KW. User can adjust according to steam capacity to make it more energy-saving and convenient.
Name | LDR0.004-0.4/0.7 | LDR0.008-0.0/0.7 | LDR0.012-0.4/0.7 | LDR0.016-0.4/0.7 | LDR0.024-0.4/0.7 |
Rated power | 3KW | 6KW | 9KW | 12KW | 18KW |
Rated voltage | 220V | 220/380V | 380V | 380V | 380V |
Main valve diameter | DN15 | DN15 | DN15 | DN15 | DN15 |
Safety valve diameter | DN15 | DN15 | DN15 | DN15 | DN15 |
Inlet diameter | DN15 | DN15 | DN15 | DN15 | DN15 |
Drainage diameter | DN15 | DN15 | DN15 | DN15 | DN15 |
Size | 400*560*930 mm | 400*560*930 mm | 400*560*930 mm | 400*560*930 mm | 400*560*930 mm |
Name | LDR0.032-0.4/0.7 | LDR0.05-0.4/0.7 | LDR0.065-.4/0.7 | LDR0.075-0.4/0.7 | LDR0.1-0.4/0.7 |
Rated power | 24KW | 36KW | 48KW | 54KW | 72KW |
Rated voltage | 380V | 380V | 380V | 380V | 380V |
Main valve diameter | DN15 | DN20 | DN25 | DN40 | DN40 |
Safety valve diameter | DN15 | DN20 | DN20 | DN20 | DN20 |
Inlet diameter | DN15 | DN15 | DN15 | DN15 | DN15 |
Drainage diameter | DN25 | DN40 | DN40 | DN40 | DN40 |
Size | 400*560*930 mm | 610*635*1100 mm | 610*635*1100 mm | 610*635*1100 mm | 610*635*1100mm |
Our factory produces various types of steam generators. If you need more detailed parameters, please contact us.
The body is the pressurized element of the steam generator, which can withstand the pressure. For details, please refer to the factory nameplate. Electric heating is located at the top of the steam generator.
Electric heating pipe is the steam generator heating equipment, it by thermal conversion, within the prescribed time, heating the water into steam, because the heating part of the heating pipe completely submerged in the water, so particularly high thermal efficiency
The controller is located on the steam generator circuit board.
It has these functions: automatic water inlet, automatic heating, automatic protection, low water alarm, overpressure protection, leakage protection.
water pump is a water supply device of a steam generator. It can supply water automatically when the steam generator is short of water or has no water.
Installed at the bottom of the steam generator, it can remove the dirt in the steam generator through the clean, in the use of pressure no more than 0.1Mpa sewage.
12kw electric steam boiler water tube boiler Application:
12kw electric steam generator low pressure electric boiler is widely used:School laboratories,chemical reaction, washing equipment(dry cleaners,washing machine, ironing machine etc.), biological equipment (autoclave,fermentation tank,sterilization tank etc.),hot water supply, mess hall cooking, food sterilization, concrete building material surface steam curing etc.
Our company's boilers are fast-fitted/packaged boilers, installation is simple and quick, even a general technical staff can install in place. User brochures and boiler design drawings can guide customers to install, and we can also guide installation via e-mail and telephone. One ton and above boiler we can send engineers to the customer's site to guide the installation and commissioning of qualified, and train related operation staff on-site of the appropriate use of the equipment.
Identify the type of boiler you want(steam boiler or hot water boiler).
The boiler capacity,pressure,and fuel(oil,gas,biomass,coal),or you can consult us.
Guide installation online or we can provide staff installation by our staffs, but you have to afford the extra cost if If we send professional staff overseas to install it.
Generally, it will take 20 to 40 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
We will supply professional after-sale service team as soon as we receiving your problem feedback, we will dispatch our engineers to your country and solve your problems right now.