LB1500 Asphalt mixing plant
Parameters :
Type |
LB1500 |
||
Production capacity (t/h) |
120 |
||
Cold aggregate supply system |
Feeder hopper (pcs) |
4 |
|
Hopper volume(m3/pc) |
9 |
||
Loading width(m) |
3.3 |
||
Drying system |
Drying drum L1×L(m) |
1.8x7.2 |
|
Driving power(kW) |
4x7.5 |
||
Burner capacity(MW) |
11 |
||
Fuel |
Diesel, heavy oil or gas |
|
|
Mixing tower |
Screening mode |
Double vibration motor / linear screening |
|
Screen driving power (kW) |
2x3 |
||
Screen layer |
4 |
||
Hot bin volume (m3) |
24 |
||
Mixer capacity(kg/batch) |
1700 |
||
Mixer driving power(kW) |
45 |
||
Filler supply system |
Stone powder silo volume(m3) |
25 |
|
Recycled powder silo volume(m3) |
15 |
||
Dust collection system |
Dust collection mode |
Primary gravity dust collection + secondary bag filter pulse cleaning |
|
Filtering area(m2) |
528 |
||
Bitumen supply system |
Bitumen tank (pc x m3) |
1 x50 |
|
Hot oil furnace (×104kal/h) |
40 |
||
Total power (kW) |
310 |
||
Covering area (m x m ) |
40x30 |
||
Optional |
End product underneath storage (m3) |
13 |
|
End product side storage (m3) |
50 |
Note: the parameters on this page are for reference only. The actual figures are subject to the actual configuration, and the interpretation right belongs to the manufacturer.