Enquiries
Message
Home > Products > Construction & Real Estate > Formwork
Cantilever Formwork with Great Performnce for Multi-storey Building
  • Cantilever Formwork with Great Performnce for Multi-storey Building

Cantilever Formwork with Great Performnce for Multi-storey Building

FOB Reference Price
Purchase quantity ()
Minimum order quantity
Payment
Trade Capacity
Export Percentage
Nearest Port
TIANJIN,SHANGHAI
Accepted Delivery Terms
Employees
above 1000 people
Accepted Payment Currency
USD,EUR,JPY,HKD,CNY
Average Lead Time
5 Day(s)
Certifications
ISO9001
Product Specifications
Model Number
Fromwork-03
Brand Name
CMAX
Product Description

Product Description:

1. Structure of  Cantilever Formwork Description

Cantilever Formwork is  mainly used in the concrete pouring of pier, high buildings, and so on. The concrete lateral pressure is entirely supported by anchor system and the wall-through tie-rods, additional reinforcement is not needed. The construction is easy, rapid and economical.  A single pouring height is high and the finished concrete surface is perfect. Cantilever formwork has several types, the structure is similar, and has its own different characteristic. Can use them according to actual demand.

Main cantilever Formwork:PJ200 & PJ240,CB-240 etc.

Cantilever formwork is used in dams, piers, retaining wall and cooling tower etc. All the concrete side-pressure is borne by the anchors and the brackets. As there is no through-wall tie-rod, the concrete is very clean.

The formwork can be moved backward by 600mm for cleaning the formwork and fixing the reinforcing steel bar. Waler connector is used for connecting the form to ensure form alignment.

Form can be pushed to the already cast concrete by turning the adjust carriage to avoid concrete offset or leakage.The formwork can be moved freely as you request. The formwork can be inclined backward and forward. Max. angle: 30°. High standard elements can be widely used.

2. Main Features of  Cantilever Formwork

-easy to assemble

-simple structure.

-easy, rapid and economical.

The M30/D20 climbing cones have been designed especially for single-sided concreting using cantilever formwork in dam construction, and to allow the transfer of high tensile and shear forces into the still fresh, unreinforced concrete. Without wall-through tie-rods, finished concrete is perfect.

3.   Cantilever Formwork Specifications

Anchor  system

Anchor system is the most important supporting part. The system is made of five parts shown below. There into, tensile bolt, anchor shoe and bowl-climbing cone can be taken out for reusing after the concrete pouring.

① Tensile bolt M30/L= 110

② Anchor shoe

③ Bowl-climbing cone M30/D15

④ High-strength rod D15

⑤Ancor plate D15


4.FAQ of  Cantilever Formwork

     

1) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed.

   . If the products are not based on the requirements, there will be the relevant compensations made for you.

2) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Steel Frame Formwork GK120 cost can be refund after order is confirmed.

   . If the products are not based on the requirements, there will be the relevant compensations made for you.   

3) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed.

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  



Cantilever Formwork with Great Performnce for Multi-storey Building from China supplier

No desirable products?
How to start your business
  • Step 1
    Find your interested products by search keywords
  • Step 2
    Contact the supplier by clicking ”Enquire” or “request meeting” button, otherwise, you also could consult our import consultant.
  • Step 3
    After verifying your email, get response from suppliers or our trade manager will contact you as soon as possible
  • Step 4
    Set up meeting with the Chinese supplier without language barrier
Send Enquiry
ToHuijuan Wang
China National Building Materials & Equipment Import & Export Corporation
Enquire
Supplier's popular products
Related Categories
CeilingsCornerGuardsFireproofingMaterialsLadders&ScaffoldingsMasonryMaterialsWaterproofingMaterials
Popular Searches
mivan formworkosb formworkzoom forkaari work* reworkbeamsworkmetal formworkgates formworkxcr forkformwork toolsgotta workcermarkpile formworkfoam formworkvorwerkmeva formworktable formworkgotta workbeam formworkzoo yorkformwork plankdri workperi formworkmeva formworkzari worksbeam formworkpororozari workfoam swordsoapwortgotta workdri workgotta workdri workosb formworkzari workearmorekomarkformwork pinsbrick formwork