Model | Installed Power (kw) | Power Consumption (kw) | Capacity (kg/h) | Dimension (m) |
DSE65 processing line | 74 | 52 | 120-180 | 17*1.2*2.2 |
DSE70 processing line | 95 | 70 | 200-300 | 20*1.5*2.2 |
DSE75 processing line | 110 | 82 | 250-400 | 26*1.5*2.2 |
DSE85 processing line | 139 | 104 | 400-800 | 28*3.5*4.3 |
DSE90 processing line | 132 | 75 | 800-1200 | 28*3.5*4.3 |
DSE95 processing line | 165 | 90 | 1500-2000 | 35*3.5*4.3 |
DSE120 processing line | 469 | 380 | 2000-2500 | 45*20*22 |
DSE135 processing line | 712 | 570 | 3000-3500 | 50*20*25 |
FAQ
Q: Are you a trade company or a manufacturer?
A: we are a manufacturer, welcome to visit our factory and check the machines.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 20-35 days if the goods are not in stock, we could discuss before contract.
Q: Could you supply all the parameters about the machines?
A: Yes, we will supply all the parameters, price, layout drawing, factory design etc.
Q: What is your terms of payment ?
A: 30% T/T in advance , 70% balance before shippment after inspection.
Q: How about the after-service?
A: We will send 1 engineer to the buyer's factory for 7-14 days period installation and training to the operators.
Q:do you supply any formula to buyer?
A: yes, we supply formulas to buyer.
Packing and delivery
• Inside package is plastic film, outside is wooden or plywood case(based on the customers’
need).
• Only plastic film nude packing with wooden pallet.
• We can supply fumigation package and certificate.
• Shipping, train, express or upon clients' demands.