Multi-tube blowing microduct cable adopts a non-metallic reinforcement and no armor structure, which can be laid by pulling or air-blowing the micro-pipe in the laid outer protective tube, and then laying the micro-cable in the micro-tube It breaks through the limitations of the existing pipeline cable routing technology, improves the utilization efficiency of the pipeline, and is easy to expand.
With the current technology, the minimum blowing length once time is not less than 1000 meters within 30 minutes.