Small diameter A270 stainless steel tubes piping
meters. Now we have staff more than 400 people. We have 24 years experience in stainless steel tube production,
accumulate more than 500 customers, including distributors, the users in factory makers, the terminal customers,
the grand construction enterprise, the trading company, and direct foreign customers etc. In present, the proportion
of domestic and foreign market is 8:2. We sale around the world, customer mainly from the Middle East,
the
Connection method of A270 stainless steel tubes piping | |
![]() | Step 1: Cut the pipe Assemble the press-fitting tool according to the instructions and check to avoid anything missing. Cut the pipes according to the design drawing, or cut the pipes according to the real requirements in the spot. |
![]() | Step 2: remove the burr After cutted the pipes, the burr should be removed completely with special burring tool or file to avoid damage to the sealing ring. |
![]() | Step 3: Check the sealing ring Checking the sealing ring in the fitting if it is contaminated and misplaced, the inside of the faucet and the end part of the pipe shoud be cleaned to avoid water and oil, etc on them. |
![]() | Step 4: Insert the pipe Before install, insert the pipe in the end of fitting, and draw a line to set the position on the connecting of pipes and fittings, and then draw out the pipe from fittings, check if insert in the right place. Insert the pipe straightly into the fitting, take care not to damage the seal ring, and confirm that the distance between the end part of the fitting and the mark line is less than 3mm. |
![]() | Step 5: Press-fitting Align the ring-form concave of pressing jaw with the rim on press-fitting, in groove of which a rubber ring is mounted, and compress it bty pressing tools. |
![]() | Step 6: Checking After compressed, check the finished press-fitting if any abnormal. Such as: Displace too large. |